News archive

Page: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
07.03.2007 It's springtime...
... and farmers adjust their ploughs and mowers. For these high-performance front/rear mower combinations USD supplies end caps and bottom edges, which are produced by...
> continue
    
27.02.2007 Electronic Data Exchange
Besides VDA 4905 (delivery instruction) USD now supports VDA 4916 (Kanban call-off) according to ODETTE standards. A support of further VDA standards is planned for later...
> continue
    
09.02.2007 Shafts and rings for drives
USD produces forged output shafts and rings for planetary drives, which offer a maximum torque from speed zero. Developed for servo and IEC motor mounting, these planetary...
> continue
    
02.02.2007 USD goes 3D
After an intense testing period we implemented Alibre, a 3D CAD software. Since we implemented the multi format viewer AUTOVUE end of 2006, our technicians now have powerful high...
> continue
    
26.01.2007 Return of the Big Bike
The Big Bike MZ 1000S features uncompromising sportiness and individual comfort. 117 horse powers and a modern light weight design are combined with interesting details - such as...
> continue
    
22.01.2007 Electronic Data Exchange
USD offers electronic data exchange (EDI) according to the ODETTE standard and German Automobile Industry (VDA). Besides...
> continue
    
17.01.2007 USD construction site: room with a view
The new hallway is covered by a pyramid-shaped skylight.

In case of intense sunshine two sides of the pyramid can be electronically opened for better air supply.
> continue
    
05.01.2007 Level controller
This electronic level controller reacts on the resistance of fluid materials, its body and flange are produced by investment casting in AIS 316L. Besides its approval for...
> continue
    
18.12.2006 Aluminium and Zinc: USD extends its supply
In 2006 we extend our supply for Aluminium parts: besides gravity and pressure die casting we now offer Aluminium sand casting, the ISO/TS 16949:2002 is planned for 2007. Du...
> continue
    
23.11.2006 USD construction site: front, electrics, plumbing
The outside front has been completed, now the interior installations go straight ahead: The radiators have been installed and the electrical installation is almost...
> continue
    
Page: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

 

News

23.02.2021
Quality assurance software QS1
USD Formteiltechnik has succeeded in integrating the QS1 quality...
> more
08.01.2020
Euroguss 2020
Visit us at Europe's only die-casting trade fair in Nuernberg from 14...
> more
> all News

Exhibitions

  21.-23.06.2022
CastForge 2022, Stuttgart
Hall 5, Booth C31
  08.-10.06.2022
Euroguss 2022, Nürnberg
Hall 7, Booth 157